| Company | Product DevelopmentAn engineering prototype model of Bright-Guard has been developed to prove the concept and basic design of the product. The engineering prototype satisfactorily demonstrates the technical feasibility and basic operation of the product. The following is a list of additional engineering development work that is required before the product is ready for mass production. The man hours column is the estimated number of hours to complete each task.
The technical feasibility has already been proven on the engineering prototype. The balance of the engineering development program will consist primarily of refining the design to optimize the performance and reliability and to reduce manufacturing costs. No other special facilities except the special test equipment mentioned above will be required to complete the development. A technician will be required to assist Mr. K.V.Menon with the engineering development. |
Business Plan Marketing primer Equity financing
|
||||||||||||||||||||||
©
Moon-Stone Group - All Rights Reserved 2000. Terms and Conditions |